Product Detail :
|
SW I Replacement of steel girder with <spanspan> style="colorblack; background-color baffc9;">PSC slabspan>span style="colorblack; background-color FFB3BA;">spanspan>> for <spanspan> style="colorblack; background-color FFB3BA;">Bridgespan style="colorblack; background-color FFB3BA;">spanspan>> No. 490 (1x12.20m) at Km 29/800-900 between Rajanukunte and Dodballapur stations of Baiyappanahalli - Dharmavaram section. SW-II Replacement of steel girder with PSC slabs of size above 9.15m and up to 12.20m spanspan> bridges for <spanspan> style="colorblack; background-color FFB3BA;">Bridgespan style="colorblack; background-color FFB3BA;">spanspan>> no. 448 at Km 8/398 between Nayandahalli (NYH) - Jnana Bharati Halt (GNB) stations of Bengaluru - Mysuru section. Maintenance period is 6 months or one monsoon period whichever is later.
|
Tender Detail : |
Sw I: Replacement of Steel Girder with Psc Slab for Bridge No. 490 (1x12.20m) at Km 29/800-900 Between Rajanukunte and Dodballapur Stations of Baiyappanahalli - Dharmavaram Section. Sw-ii: Replacement of Steel Girder with Psc Slabs of Size Above 9.15m and Up to 12.20m Span Bridges for Bridge No. 448 at Km 8/398 Between Nayandahalli (nyh) - Jnana Bharati Halt (gnb) Stations of Bengaluru - Mysuru Section. Maintenance Period is 6 Months Or One Monsoon Period Whichever is Later. |