Product Detail :
|
Formation of Industrial Layout including Formation of road no. E- 10 of 24m wide roads and 30m wide roads of flexible pavement, construction of RCC side drains, RCC Box culverts, RCC utility ducts, RCC Retaining Wall, drain crossings, etc., at Sector-7 of Phase-3 of Dharwad Industrial Node.
|